American DND crews, complemented by Wargo Enterprises, safely completed the demolition, size reduction, and loadout of this former steel storage silo capable of handling 1,000 tons of cement storage. The 80 ft. tall, 35 ft diameter steel silo was located along the Lake Erie waterfront in Buffalo, NY. We demolished the silo on June 12, 2010, utilizing structural modifications and the ‘Cut & Pull’ technique to safely “fell” the structure in a controlled manner.